With our relocation (12 houses down the street) in 2017, all of Bruce's layouts got torn down and moved.

Decisions have been made as to the future of the indoor layout.

  • Scale will change from HO to On30
  • Control will change from DCC to Power-On-Board wireless operations.
  • The era will change from transition-era to depression-era narrow gauge.
  • The locale will move from Santa Maria, CA to Southern Colorado.

Design work is ongoing. Construction is held at the benchwork level while Bruce and Linda work on getting the outdoor layout - the entire backyard - presentable.

Information on this site represents Bruce’s experiences and opinions.

They are presented without warranty as an example of ways to utilize DCC products.

The user is solely responsible for any use made of this data.